Deadline to comment on the Approval to Operate for the Arauco Canada Limited wood composite products manufacturing mill

Class 1 Air Quality Operating Approval issued under the Clean Air Act

Effective December 14, 2021, the 180-day review process begins on the renewal of the Approval to Operate for the Arauco Canada Limited wood composite products manufacturing mill complex located in St. Stephen, New Brunswick.

Comments received by January 25, 2022, will be included in the interim summary made available mid-way through the 120-day comment period, which runs from December 14, 2021 to April 12, 2022.

Information on how to get documentation, or provide comments can be obtained by contacting:
  • Joyce Wang, Approvals Engineer, Authorizations Branch, Department of Environment and Local Government, P.O. Box 6000, Marysville Place, Fredericton, NB, E3B 5H1, Telephone: (506) 453-7945, Fax: (506) 453-2390, E-mail: [email protected]
  • Patrick Stull, Regional Director, Region 4 – Saint John, Department of Environment and Local Government, 8 Castle Street, P.O. Box 5001, Saint John, NB, E2L 4Y9, Telephone: (506) 658-2558, Fax: (506) 658-3046, E-mail: [email protected]
  • Any regional Environment office or by accessing the Public Information Access Site on the Internet at Current Public Review Processes (gnb.ca)
Information regarding technical aspects of this approval, the facility, and its operation may also be directed to:

Brett Hooper, Environmental Coordinator, Arauco Canada Limited,
151 Church Street, St. Stephen, NB, E3L 3A6,
Telephone: (506) 465-2925, Fax: (506) 466-7113,
E-mail: [email protected]

Click here to view the web page for the consultation.